Tm602g phase 2 tech spec

Touchstone® TM602G Telephony Modem with Integrated Battery Back-up Specifications
Specifications
Physical
Overall Unit Weight – no Pack installed – 1.25 (0.57) 8 Hour Battery Configuration (Short, Light or Dark-Grey Case) Overall Unit Weight -- Pack Installed – 12 Hour Battery Configuration (Long, Dark-Grey Case) Overall Unit Weight – Pack Installed – 24 Hour Battery Configuration (Long, Thick, Dark-Grey Case) – Battery Pack must be purchased separately Overall Unit Weight – Pack Installed – AC Fail, Battery Low, Battery Missing, Replace Battery Power, DS, US, Online, Link, Telephone 1, Telephone 2, Battery Interfaces
10/100 Base-T Ethernet (RJ-45 connector), USB 1.1 Series B connector 2 lines; RJ-14 (“Line 1/2”),, RJ-11 (“Line 2”) ARRIS Technical Specifications
Specifications Continued
Telephony
Provisionable High Loop Current Mode Yes (40mA constant current source, NA templates ONLY) RF Downstream
RF Upstream
QPSK, 8-QAM, 16-QAM, 32-QAM, 64-QAM & 128-QAM (S-CDMA only) +8 to 55dBmV (8-QAM, 16-QAM)+8 to 58 dBmV (QPSK) Standards
CODEC: G.711, 64 kbps, μ and A-law encoded speechEnhanced CODEC firmware support (G.726, G.728, G.729E)T.38 Fax RelayRFC 2453 DOCSIS 2.0 based PacketCable 1.0 & 1.5 basedRFC3261 SIP: Session Initiation ProtocolUL® 60950, FCC Part 15 Class B, CEWHQL and USB-IF Notes:
1.
Storage above 77°F (25°C) will significantly reduce life of the battery and is not recommended. Battery back-up times are typical and can be influenced byy the age of the battery, the charging state, storage conditions and operating temperature as well as factors such as data activity and length of active telephone calls. The capabilities, systemrequirements and/or compatibility with third-party products described herein are subject to change without notice. The capabilities, system requirements and/or compatibility with third-party products described herein are subject to change without notice.
ARRIS Technical Specifications
Ordering Information
Part Number
Description
TM602G/NA-0, PHASE 2, DOCSIS 2.0 / PacketCable 1.0/1.5 Compliant E-MTA Integrated 115 VAC, 60 HZ Power supply w/ 6 foot power cord with NEMA 1-15
Includes Quick Install Guide, Ethernet Cable,, USB Cable, and CD-ROM with Users Guide
NO battery included
Touchstone TM602G/NA-8, ,PHASE 2, ,DOCSIS 2.0 / PacketCable 1.0/1.5 Compliant E-MTAIncludes 2-cell 2.2AHr, Li-Ion Battery Pack for up to 8 hours of battery back-upIntegrated 115 VAC, 60 HZ Power supply w/ 6 foot power cord with NEMA 1-15Includes Quick Install Guide, Ethernet Cable,, USB Cable, and CD-ROM with Users Guide Touchstone TM602G/NA-12, PHASE 2, DOCSIS 2.0 / PacketCable 1.0/1.5 Compliant E-MTA, Truck PackIncludes 4-cell 2.2AHr, Li-Ion Battery Pack for up to 12 hours of battery back-upIntegrated 115 VAC, 60 HZ Power supply w/ 6 foot power cord with NEMA 1-15Includes Quick Install Guide, Ethernet Cable,, USB Cable, and CD-ROM with Users GuideTruck Pack Packaging (order in increments of 5 units) Spare 2-Cell, 2.2 Ah, Li-Ion Battery Pack for T Spare 4-Cell, 4.4 Ah, Li-Ion Battery Pack for T Spare 8-Cell, 8.8 Ah, Li-Ion Battery Pack for T TM602G and TM504G/H (Cannot be used in TM502G/H). Sold separately, no kitted TM602 Phase 2 option available
Specifications are subject to change without notice.
The capabilities, system requirements and/or compatibility with third-party products described herein are subject to change without notice. ARRIS, the ARRIS logo, Auspice®, C3™, C4®, C4c™, Cadant®, C-COR®, CHP Max®, ConvergeMedia™, Cornerstone®, CXM™, D5™, Digicon®, Flex Max®, Keystone™, MONARCH®, n5™, nABLE™, NSM™, nVision®, OpsLogic®, OpsLogic Service Visibility Portal™, PLEXiS®, PowerSense™, Regal®, ServAssure™, Service Visibility Portal™, TeleWire Supply®, TLX®, Touchstone®, VoiceAssure™, VSM™, and WorkAssure™ are all trademarks of ARRIS Group, Inc. Other trademarks and trade names may be used in this document to refer to eith 2009 ARRIS Group, Inc. All rights reserved. Reproduction in any manner whatsoever without the express written permission of ARRIS Group, Inc. is strictly forbidden. For more information, contact ARRIS.

Source: http://www.bcd.com.ar/admin/files/productos/12_TM602G_phase2_TS_23OCT09_web.pdf

taiheiyo-cement.co.jp

Third-Party Opinion Impact of the Great East Japan Earthquake and Our Efforts I understand finalizing the business restructuring without exceptions was as I mentioned above, CSR due diligence from the perspective of human Here we report on the situation and efforts of the company (as of July 2011) concerning the earthquake off the coast painful. You also had to respond to the Grea

Microsoft word - white,cv.doc

ERIC M. WHITE, O.D., INC. 5075 Ruffin Road Suite B, San Diego, CA 92123 STATEMENT OF CURRICULUM VITAE EDUCATION June 1982 Bachelor of Arts, Physiological Psychology University of California, San Diego; San Diego, California. Southern California College of Optometry; Fullerton, California. Southern California College of Optometry; Fullerton, California. PRIVATE PRACT

Copyright © 2011-2018 Health Abstracts